028877 46163 or 07739 793 824info@dpccontracts.com163 Washingbay Road, Coalisland, Co Tyrone, BT714QE
DPC Contracts (NI) LimitedDPC Contracts (NI) Limited
DPC Contracts (NI) Limited
Construction, Civils and Facilities Management Company in Northern Ireland
  • Home
  • About Us
  • Testimonials
  • Recent Projects
  • Quality
  • Contacts
    • Get In Touch
    • Useful Links
  • News
Menu back  
LinkedinFacebookTwitter

Author Archives: brandingbay

You are here:
  1. Home
  2. Portfolio
  3. (Page 2)
ZoomDetails

Construction of Transformer and Switch Room

The objective was to boost the overall power to the electrical supply for the main manufacturing plant. The task was to complete construction of key operations/control area for a Manufacturing Company. DPC Contracts piled the foundations with structural steel, in situ concrete and ring-beams finished off with a traditional superstructure construction i.e. cavity wall with a…
November 29, 2014Case StudiesBy brandingbay
ZoomDetails

Internal Fitout for a Large Food Manufacturer

A Large Manufacturer needed ceilings installed in a high-care environment. The objective was to provide a food-safe finish and a fully serviceable plan void with the minimum amount of downtime and disruption from food production and minimal contamination to the environment. The installation of 150mm Kinspsan Composite Panel in a food-safe environment. The main dairy floor was…
November 29, 2014Case StudiesBy brandingbay
ZoomDetails

Installation of a vital piece of kit for a Food Company

A Food Company required the installation of a vital piece of kit to improve food production rates. The objective was to achieve the minimum amount of downtime and disruption from food production and minimal contamination to the environment. The installation of £1m, 7-tonne piece of kit into an existing factory environment in 12 hours. DPC successfully installed…
November 29, 2014Case Studies, Internal FitoutBy brandingbay
ZoomDetails

Essential groundworks at a large Engineering Plant.

Objective: Works to be carried out during a 1-week window (Summer Holiday shutdown). DPC contracts removed over 300m2 of defective main works yard which was 300mm in depth. This area was then re-concreted and ready for use in 4 days in total. The main challenge in this work was to achieve completion within the 5-day window…
November 29, 2014Case StudiesBy brandingbay
ZoomDetails

Asbestos Encapsulation Contract – working to tight deadlines

DPC has routine experience of Asbestos Encapsulation, working to tight deadlines. This is performed by sealing the asbestos in a protective shell with the use of a polyurethane spray foam. This spray increases stability, reduces leaks and seals surfaces as it spreads out. Asbestos Encapsulation negates the need to remove offending products like asbestos which…

November 29, 2014Case StudiesBy brandingbay
ZoomDetails

Specialist Equipment Installation for a Supermarket Chain

DPC has installed a dock-leveller for a main supermarket chain. The main works area was excavated within a live loading bay. The team installed reinforcement, shuttering and in situ concrete allowing for connection to storm water, drainage and service pipework. All works were carried out in a live environment with minimal disruption and timely execution…

November 29, 2014Case StudiesBy brandingbay
12
Prev page
DPC Contracts (NI) Limited
© 2018 DPC Contracts (NI) Limited | Privacy Statement and Cookies Policy

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in settings.

DPC Contracts (NI) Limited
Powered by  GDPR Cookie Compliance
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.

Cookie Policy

More information about our Cookie Policy